How to Perform the Live-Dead-Live Test for Electrical Safety

Updated: May 29



The “Live-Dead-Live” test is a straightforward, yet crucially important part of maintaining safe conditions when performing electrical work.


The correct methodology for the test is found in NFPA 70E 2024 Article 120.6, which lists the necessary steps to verify that a circuit is de-energized before work begins. 


This article is designed as a practical guide to the Live-Dead-Live test, further explaining what it is, why it matters, and the exact steps to perform it safely and effectively.


What is the Live-Dead-Live Test?


The Live-Dead-Live test confirms there is no voltage in the electrical circuits you will be working on, protecting you and others from electrical hazards.


In this test, you:


  1. Test your meter on a known live source to verify it’s working (Live).

  2. Test the circuit you’re working on to confirm there’s no voltage (Dead).

  3. Test the meter on a live source again to ensure the meter is still functioning correctly (Live).


This verification cycle checks your meter’s reliability before and after measuring the target circuit to prevent faulty or inconsistent readings and the resulting dangers.


Why the Live-Dead-Live Test is Critical


Even small mistakes in carrying out the Live-Dead-Live test can have severe consequences like shock, electrocution, and arc flashes. It pays to be meticulous.


You must always ensure that your environment is truly de-energized before starting any work. Follow these steps exactly to  protect against unforeseen hazards and confirm that your equipment, especially the meter, is functioning as it should.


How to Perform the Live-Dead-Live Test


The Live-Dead-Live test includes additional steps before and after. Before you conduct the test, check the meter’s battery and ensure it is rated for the voltage level you’ll be testing. 


Step 1: Perform the First “Live” Test


  1. Test the meter on a known live source, such as an outlet or a verified live circuit.

  2. Confirm that the meter reads voltage accurately. This initial test verifies that your meter is working as expected.


Step 2: Perform the “Dead” Test


  1. Use the meter to test the target circuit you’re about to work on.

  2. Conduct phase-to-phase and phase-to-ground tests to confirm there’s no voltage present. For a three-phase system, this means checking:

    • Phase 1 to Phase 2

    • Phase 1 to Phase 3

    • Phase 2 to Phase 3

    • Each phase to ground


Testing each phase ensures no hidden voltages are present, which is critical for creating a truly safe work condition.


Step 3: Perform the Final “Live” Test


  1. After confirming the circuit is de-energized, re-test the meter on the known live source.

  2. Verify the meter still functions correctly. This final check ensures your meter was reliable during the “Dead” test.


Test Each Point of Work


NFPA 70E 2024 now requires workers to verify the absence of voltage at each point of work. Consequently, if you’re working on multiple sections of a piece of equipment, repeat the Live-Dead-Live test at each location.


Common Mistakes to Avoid During the Test


  1. Skipping Steps: In a rush, you might skip verifying the meter before or after testing the circuit. This can undermine the safety of the entire procedure.

  2. Using the Wrong Verification Source: If testing an AC circuit, use an AC source for the initial “Live” test to align with the circuit type. While NFPA 70E allows any known live source, choosing the correct type ensures accuracy.

  3. Not Testing All Phases: Ensure you test all phase combinations to ground and between phases. Incomplete testing can miss hidden voltages.

  4. Neglecting Personal Protective Equipment (PPE): Always wear the correct PPE when working with electrical circuits, especially when testing live sources. Skipping PPE can expose you to severe risks.


Wrapping Up


The Live-Dead-Live test may seem simple, but performing each step thoroughly and accurately is crucial for electrical safety. This test confirms both the absence of voltage and the reliability of your meter, ensuring that your work environment is genuinely safe.


If you’re unsure about performing the Live-Dead-Live test or want to learn more about electrical safety practices, consider professional training. Rozel offers courses on electrical safety, equipping you with the knowledge to perform these tests with confidence.


 
 